Ground investigation
Geotechnical consultancy
Contaminated land assessment

Wyvil Road, Vauxhall, London SW8

January 8, 2018
by Matt Legg

The proposed development for this site comprised the demolition of the existing buildings and the subsequent construction of a 36-storey residential tower, standing at around 120 m high, with two commercial podium buildings of between five storeys and eight storeys.

Read more

Development of Ten Lock Flight Public House, Runcorn

January 2, 2018
by Steve Branch

In mid-2104 Wildgoose Construction asked GEA to review the findings of three previous phases of investigation at a site in Runcorn adjacent to the Bridgewater Canal, where significant contaminated land issues had been identified.

Read more

The Trouble with Groundwater

January 1, 2018
by Steve Branch

The biggest problem with groundwater, particularly in the sort of mixed soils that characterise much of the southern half of the UK, is how difficult it is to determine where it is in the ground. This, of course is not really what the client wants to hear.

Read more

What is Construction Waste?

December 19, 2017
by Mike Plimmer

“Waste” is defined in Article 1(a) of the European Waste Framework Directive (WFD) as ‘any substance or object … which the holder discards or intends or is required to discard’.

Read more