Architects
Penoyre & Prasad
Engineers
Price & Myers
Client
Moorfields NHS Trust
Location
London, EC1
Sector
Healthcare
GEA Services
Ground investigation
Interpretive reporting
GEA Engineer
Juliet Fuller
Associate Director
The proposed Richard Desmond Children’s Eye Centre (RDCEC), was to comprise eight-storeys with a single level basement which involved deepening the existing basement by 1.5 m. The initial investigation comprised cable percussion drilling to provide information to assist with piled design and a number of manually excavated trial pits to investigate the existing foundations and determine the required extent of underpinning. The second phase of investigation included window sampling to provide coverage of the main hospital site to the north for the construction of a single level basement linking the original hospital with the new children’s centre. The Richard Desmond Children’s Eye Centre opened in February 2007 and is the largest hospital in the world solely dedicated to the prevention, treatment and cure of children’s eye disease
