Architects
Stephenson Studio,
formerly Stephenson Bell
Engineers
Price & Myers
Client
Chetham’s School of Music
Location
Manchester
Sector
Cultural / Education
GEA Services
Desk study
Ground investigation including rotary coring and deep shored trial pits
Contamination assessment
Ground anchor advice
Value engineering
Interpretive geotechnical and geoenvironmental reporting
GEA Engineer
Martin Cooper
Technical Director
The investigation scope was adjusted, the presence of very substantial retaining walls was confirmed and, based on our experience of the area, we proposed that temporary anchors could be used to retain the existing walls. This proved to be significant in the viability of the project; it removed the need for an expensive bored pile retaining wall and avoided propping, such that the contractor could build within an open excavation.
As well as boreholes and trial pits typical for such an investigation, deep shored trial pits were also excavated to locate a culvert carrying the River Irk past the site and horizontal coring and a geophysical survey were used to investigate the potential presence of Victorian railway vaults.
The project has been awarded both RIBA North West & National Awards 2017.