Radley Rowing Centre
Architects
Mulroy
Engineers
Kfr consulting
Client
Radley Rowing Centre
Location
Abingdon, Oxfordshire
Sector
Sport and Leisure
GEA Services
Desk study
Ground investigation
Interpretive geotechnical report
GEA Engineer
Steve Branch
Managing Director
A shallow investigation was carried out by GEA using unobtrusive equipment to enable the design of this lightly loaded structure.
The new building contains a state of the art rowing tank that closely mimics actual river conditions, permitting on-site training throughout the year regardless of the weather. The building was designed by Mulroy architects and was a winner in the ‘Design through Innovation’ category for the RICS Awards 2016.
