The Boltons
Architects
Blair Associates
Engineers
Michael Alexander Consulting Engineers
Client
Private
Location
London, SW10
Sector
Private Housing
GEA Services
Desk study
Restricted access ground investigation
Interpretive geotechnical reporting
GEA Engineer
Steve Branch
Managing Director
Access was severely limited by the layout of the existing house and the investigation was designed within the confines of the restricted access. A single cable percussive borehole was advanced to a depth of 24.5 m using a dismantlable drilling rig in the rear garden, with the drilling equipment manhandled down the passage to the side of the house.
The findings of the borehole indicated that formation levels of the 8.5 m and 10.0 m deep basement excavation would be below the groundwater table in the River Terrace Deposits and that some form of groundwater control would be required in order to construct the basement. A secant bored piled wall was installed, and this wall is now completed.
